Re-Scheduled: Sutter Creek Bridge Shut Down 8/26/18

Re-Scheduled: Sutter Creek Bridge Shut Down 8/26/18

The planned shut down for the Sutter Creek Bridge Project has been rescheduled to 8/26/18 at 9pm.  See new posting here.

SC Bridge 08-26-18

 

Related posts

Give a Reply

nineteen + nine =

NEW!
PAY BY PHONE

 (209) 223-3018 option 2
close-link